Echoes of Calabar Restaurant
Location
Victoria Island, Lagos.
Status
Completed 2018
Overview
The project is a remodeling of an existing semi-detached building into a restaurant. The restaurant was designed to optimize the indoor and outdoor spaces.
Praise Garden
Location
Lekki, Lagos.
Status
Ongoing
Overview
The project is a residential development that has 140 units of apartments and terraces. The project site was divided into two zones based on the building topologies.
Multi Family Residential Building
Location
Lekki, Lagos.
Status
Completed 2022
Overview
The project is a Multi-family residential building with 3 units of 2-bedroom apartments and 1 unit of 4-bedroom maisonette.
ICSAN Secretariat
Location
Alausa, Ikeja, Lagos.
Status
Construction Ongoing
Overview
The project is an office building that serves as the institute’s secretariat with lettable office spaces.
The building is zoned into 3 areas -administrative, academic, and commercial.
Beach House
Location
Snake Island, Lagos.
Status
Construction Ongoing
Overview
The project is a private residential building by the beach with ample space for outdoor activities. The building has 4 bedroom ensuite as the main unit and 2 bedroom guesthouse. The building was designed to have open spaces with adequate natural lighting and ventilation. Also, the design ensured that all the bedrooms in the main unit had a view of the beach.
Worship Center
Location
Magodo, Lagos.
Status
Concept Design
Overview
This design proposal for the project is guided by the client’s brief to design a magnificent auditorium for worship and offices for the administration of church activities.
The building was designed into two zones which are the north and south zones.
Multi Apartment Building
Location
Lekki, Lagos.
Status
Construction Ongoing
Overview
The project is the remodeling of 2 number 4 bedroom detached duplexes into 10 units apartments. The apartments include studio, 1 bedroom, and 2 bedroom apartments.
TopLoaf Bakery
Location
Agege, Lagos.
Status
Construction Ongoing
Overview
The project is a new bakery that will accommodate the increase in demand for the products. The building will also serve as the main office of the business. The building is on 3 floors, with the production area on the Ground floor. The offices and staff accommodation are on the first floor and offices on the second floor.
Primary Health Centre
Location
Yaba, Lagos.
Status
Construction Ongoing
Overview
The project is a primary health centre that serves the local community. The project was designed to ensure that the required functions are met and also provide an aesthetically appealing building.
Wemabod Office Fit-out
Location
Lagos Island, Lagos.
Status
Completed 2023
Overview
The project is the renovation of the office of Wemabod located on the 5th floor of Western House, Lagos into a contemporary office.
Wemabod Estate
Location
Ado-Ekiti, Ekiti
Status
Construction Ongoing
Overview
The project has 241 units of affordable housing and it comprises of 3 bedroom detached bungalow, 2 bedroom semi-detached bungalow, and 3 bedroom semi-detached bungalow. The project is on 10 hectares of land. The site layout and building design are functional, efficient, and minimalist.
The Bungalow
Location
Isheri-North, Lagos
Status
Completed 2024
Overview
The project is a 3-bedroom bungalow with a maid’s room. The bedrooms are ensuite, and the project has ample green areas.
Mixed-use Development
Location
Ikoyi, Lagos.
Status
Concept Design
Overview
The project is a 10-floor mixed-use development that is divided into the north and south wings based on the activities and usage. It comprises high-end retail spaces, recreational arcades, office spaces, and residential apartments.
Multi Family Residential Development
Location
Ikeja GRA, Lagos.
Status
Concept Design
Overview
The project is a residential development that has a block of 12 units of 3-bedroom apartments with maid’s room and 4 units of 4-bedroom detached house with maid’s room on 3 floors. The building design is contemporary architecture with open spaces, clean lines, and cantilever.